Michigan Governor Gretchen Whitmer announces $95 million in MI Clean Water grants to deploy non-destructive vacuum hydro-excavation crews and repave neighborhood streets following lead water service line replacements in sixteen cities.

LANSING, Mich. — Governor Gretchen Whitmer announced on Monday the distribution of $95 million in state clean water capital grants through the MI Clean Water Plan to accelerate the excavation and replacement of more than 25,000 legacy lead drinking water service lines and fund complete street restoration across sixteen Michigan municipalities.
The funding, administered by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), equips municipal public works departments with high-efficiency vacuum hydro-excavation trucks that use pressurized water and vacuum suction to expose underground pipes without destroying tree root systems or residential driveways, reducing per-line replacement costs by over 40 percent.
Eliminating Every Lead Pipe in Michigan by 2030 Under Michigan's landmark Lead and Copper Rule—the strictest drinking water standard in the nation—all public water utilities are statutorily required to replace 100 percent of lead service lines from the main watermain to the residential water meter.
"Every Michigander deserves clean, safe drinking water, free from toxic lead contamination," Governor Whitmer said during an announcement in Lansing. "Michigan is leading the nation in getting lead out of our drinking water. By investing $95 million in modern hydro-excavation technology and street restoration, we are speeding up pipe replacements, lowering costs for municipal water departments, and ensuring Michigan families can turn on the tap with total confidence."
Municipal Allocations Key city grant awards include:
Municipal water directors and clean water advocacy coalitions commended the state funding, emphasizing that full public cost coverage eliminates financial burdens on working-class residential property owners.
San Diego Mayor Todd Gloria and San Diego City Council approve $80 million in municipal water financing to construct the 8-mile Pure Water Phase Two purified water conveyance tunnel connecting the Harbor Drive facility to Lake Murray.

Ottawa Mayor Mark Sutcliffe and Ottawa City Council approve $75 million in municipal water capital funding to construct two underground 30-million-litre concrete stormwater retention vaults to eliminate untreated sewage overflows into the Ottawa River.

Vancouver Mayor Ken Sim and Vancouver City Council approve $55 million in municipal capital financing to raise and fortify four kilometers of the False Creek Seawall by one meter, protecting downtown Granville Island from coastal storm surges.
