Atlanta approved formal zoning protection and utility reservations along the BeltLine Eastside Trail to prepare for streetcar and light rail transit construction.
ATLANTA, GA — The Atlanta City Council and the Metropolitan Atlanta Rapid Transit Authority (MARTA) Board of Directors finalized an intergovernmental agreement on Sunday afternoon to formally preserve the dedicated transit right-of-way along the 2.2-mile Atlanta BeltLine Eastside Trail corridor.
The ordinance establishes strict zoning overlay protections preventing permanent commercial or residential encroachments within the designated 24-foot transit median between Irwin Street in the Old Fourth Ward and Ponce City Market. The measure coordinates subterranean utility conduits, stormwater drainage, and overhead catenary electrical pole footings for the planned BeltLine streetcar light rail extension.
The transit line will connect the downtown Atlanta Streetcar network directly to the BeltLine, providing high-capacity rail connectivity between Midtown, Downtown, and historic Eastside neighborhoods.
"The BeltLine vision has always combined trails, green space, and world-class transit," Atlanta Mayor Andre Dickens said. "Preserving this right-of-way ensures we deliver equitable, accessible public transit that connects all Atlantans to jobs and opportunity."
Urban mobility organizations praised the council vote, highlighting that streetcar rail transit along the BeltLine provides a reliable zero-emission alternative to congested east-west city arterials.
BeltLine engineering teams confirmed that the future rail tracks will be embedded with grass turf and permeable pavers, preserving the pedestrian trail aesthetic while accommodating electric rail transit.
MARTA will issue the final Request for Qualifications (RFQ) for design-build civil engineering in early 2027.
The City of Los Angeles approved capital contracts to install ductile iron seismic water trunk lines across Van Nuys and North Hollywood to prevent pipe ruptures during earthquakes.

Dallas authorized civil engineering construction for a 280-acre stormwater detention basin along the Trinity River floodplain to prevent residential flood inundation.

The Federal Highway Administration awarded grants to construct six multi-megawatt commercial charging plazas capable of recharging electric freight trucks in under 45 minutes.
