The Ottawa Transit Commission authorizes a $75 million technical retrofit package for the Confederation Line light rail transit fleet, implementing permanent axle-bearing redesigns and cold-weather track switch heaters.

OTTAWA, ON — The Ottawa Transit Commission voted on Tuesday to approve a $75 million comprehensive fleet and infrastructure modernization program for the O-Train Confederation Line, finalizing permanent technical remedies for historic axle-bearing assembly issues and winter switch reliability.
The engineering retrofit replaces the light rail vehicle wheel-hub assemblies across all 45 Alstom Citadis Spirit trainsets with a newly engineered, heavy-duty cartridge bearing design developed by rail engineering specialists. The new configuration eliminates excess mechanical vibration on tight curved track segments between Tremblay and Hurdman stations.
Real-time trackside acoustic monitoring sensors will be deployed along the alignment to detect early bearing wear before component degradation occurs, preventing unexpected service halts.
The capital package also upgrades track infrastructure with high-efficiency forced-air gas switch heaters and electrical contact line de-icing systems to prevent freezing rain and heavy snowfall from disabling track switches during harsh Ottawa winter storms.
Mayor Mark Sutcliffe stated that resolving historical LRT technical deficiencies is the city's highest transit priority, ensuring capital commuters and transit riders experience reliable, predictable public transportation.
City officials confirmed that $45 million of the modernization package is funded through warranty settlement agreements with Rideau Transit Group (RTG) and the vehicle manufacturer, with the remaining balance covered under federal-provincial transit infrastructure funds.

Calgary City Council votes to approve a $210 million joint infrastructure accord with the Alberta government, advancing engineering designs for upstream reservoir storage along the Bow River to protect against severe flooding and seasonal drought.

Halifax Regional Council approves the completion of an all-ages, all-abilities protected cycling and active transit network across the regional urban core, linking Dartmouth and downtown Halifax with multimodal connections.

Winnipeg City Council passes an accelerated $50 million infrastructure allocation to repair freeze-thaw asphalt deterioration, rehabilitate regional bridge decks, and modernize concrete arterial corridors.